Kim Dong Industrial Park

A cooperation opportunity in Hung Yen, with connections toward the Hanoi–Hai Phong Expressway and the eastern logistics corridor.

98.73 haPhase-one detailed planning
20101/2000 plan and investment certificate
20211/500 detailed plan

Location and dossier scope

Location stated in the dossier: Nghia Dan and Luong Bang communes, Hung Yen Province. The project offers access toward the Hanoi–Hai Phong Expressway and the eastern logistics corridor.

Place names and drawings come from the earlier dossier. Current administrative addresses, boundaries and project scope must be checked against updated documents.

DĐK is identified as the infrastructure investor in the Kim Dong Industrial Park project dossier.

Recorded milestones

Decision 810/QĐ-UBND

1/2000 construction planning, according to information published by the company.

Investment Certificate 05221000120

Phase one with a scale of approximately 100 ha.

Decision 1540/QĐ-UBND

1/500 detailed planning covering approximately 98.73 ha.

The current validity of the investment dossier, land already allocated or leased, and investor-admission conditions require fresh confirmation.

Technical proposal published in 2021

01

Electricity

A 110/22 kV substation was proposed within the industrial park.

02

Water supply

Phase one: 1,500 m³/day; phase two: 3,000 m³/day.

03

Wastewater treatment

Phase one: 1,200 m³/day; phase two: 2,400 m³/day.

04

Development controls

Maximum building density of 70%; height must be checked against the approved plan.

These are figures from an earlier proposal, not current operating capacity or a utility-connection commitment.

Public information requiring an update

46.3 ha

Publicly reported land inventory in 2022; the source at that time noted issues involving site clearance, place names and land procedures.

To be confirmed

Cleared and allocated/leased land, current infrastructure progress, dossier validity and project scope.

Available data is insufficient to confirm current handover readiness. The 2022 figure does not represent progress in 2026.

Documents needed before offering the project to investors

01

Project legal documents

Investment policy, planning, land, environmental and fire-safety documents.

02

Site and infrastructure

Plot map, area, site clearance, elevation and connection capacity.

03

Commercial terms

Price, fees, VAT, exchange rate, term and payment schedule.

04

Contract and procedures

Handover, security, delay remedies, refunds and procedural support.

Price schedules and contract templates must be confirmed by the legal, project and finance teams before issue.

Request updated information

Interested companies may send their requirements so DĐK can confirm which parts of the dossier are available for sharing.